{"id":14453,"date":"2026-02-19T10:56:29","date_gmt":"2026-02-19T08:56:29","guid":{"rendered":"https:\/\/www.lexis.it\/?p=14453"},"modified":"2026-02-19T10:59:41","modified_gmt":"2026-02-19T08:59:41","slug":"operational-and-upcoming-facilitation-measures","status":"publish","type":"post","link":"https:\/\/www.lexis.it\/en\/operational-and-upcoming-facilitation-measures\/","title":{"rendered":"OPERATIONAL AND UPCOMING FACILITATION MEASURES"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"14453\" class=\"elementor elementor-14453 elementor-14452\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0f2c998 e-flex e-con-boxed e-con e-parent\" data-id=\"0f2c998\" data-element_type=\"container\" data-core-v316-plus=\"true\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-37db9cd elementor-widget elementor-widget-text-editor\" data-id=\"37db9cd\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<style>\/*! elementor - v3.20.0 - 11-03-2024 *\/\n.elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}<\/style>\t\t\t\t<p>We offer below a list of the main facilitative, operational and upcoming measures:<\/p>\n<\/p>\n<p><em><strong>  SIMEST &#8211; INTERNATIONALIZATION:<\/strong><\/em><\/p>\n<p>The facility consists of low-interest financing, with the possibility of a grant of up to 10 percent (or 20 percent in some lines) on eligible costs incurred as part of internationalization projects, costs related to:<\/p>\n<p>&#8211; Certifications and Consulting<\/p>\n<p>&#8211; E-commerce<\/p>\n<p>&#8211; Trade Fairs<\/p>\n<p>&#8211; Temporary Manager<\/p>\n<p>&#8211; Digital or Green Transition (new: grant fund of up to 20% for energy-hungry companies or companies embarking on energy efficiency)<\/p>\n<\/p>\n<p><em><strong>  (LOMBARDY) BUSINESS DEVELOPMENT LINE:<\/strong><\/em><\/p>\n<p>The facility is aimed at supporting investments, with a minimum value of 100,000 euros, aimed at productive modernization and expansion, and consists of:<\/p>\n<p>&#8211; a free regional guarantee on a medium- to long-term loan provided by the Lenders and aimed at obtaining the financial resources needed for the investment;<\/p>\n<p>&#8211; A non-repayable capital grant on the investment.<\/p>\n<p>The intensity of the grant varies according to the area of the enterprise and the aid scheme applied.<\/p>\n<\/p>\n<p><em><strong>(LOMBARDY) NEW BUSINESS 2026 (opening):<\/strong><\/em><\/p>\n<p>The facility consists of a 50 percent non-repayable grant of up to 10,000 euros to partially cover expenses incurred and receipted for the startup of new entities established on or after June 1, 2025.<\/p>\n<\/p>\n<p><em><strong>INAIL CALL (opening):<\/strong><\/em><\/p>\n<p>The facility consists of a non-repayable contribution of up to 65 percent of eligible costs and up to a maximum disbursable contribution of 130,000 euros, and is aimed at supporting investments aimed at raising the level of safety in the workplace.<\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>We offer below a list of the main facilitative, operational and upcoming measures: SIMEST &#8211; INTERNATIONALIZATION: The facility consists of low-interest financing, with the possibility of a grant of up to 10 percent (or 20 percent in some lines) on eligible costs incurred as part of internationalization projects, costs related to: &#8211; Certifications and Consulting [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":13783,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[145],"tags":[],"class_list":["post-14453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-subsidized-finance-circulars"],"_links":{"self":[{"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/posts\/14453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/comments?post=14453"}],"version-history":[{"count":6,"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/posts\/14453\/revisions"}],"predecessor-version":[{"id":14462,"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/posts\/14453\/revisions\/14462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/media\/13783"}],"wp:attachment":[{"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/media?parent=14453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/categories?post=14453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lexis.it\/en\/wp-json\/wp\/v2\/tags?post=14453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}